Hassan: With the Hemavathi Reservoir reaching its full level, water is being released by opening its six crust gates.
The scenario of the water gushing out of the crust gates is something worth watching and hundreds of people are flocking the place to catch a glimpse of the same.
The reservoir reached its full level on Saturday. As the dam officials opened one gate after the other, the students and tourists who had gathered around were heard cheering.